Mobile mining solutions
to accommodate your mining equipment
AIRCORE 40
AIRCORE 20
Trident
ANTSPACE
Trident
ANTSPACE
1
Production timeline:
We produce a container in 15 days
2
Cost:
From 200,000 USD.
3
Delivery:
From 30 days
Density: up to 288
Antminer devices
Powerful ventilation: 20
industrial fans + 8 evaporator
panels (water wall)
Complete electrical infrastructure: main and distribution circuit
breakers, PDUs,
transformers,
switchboards.
Ready-made network structure: switches, routers, cables - plug
and play.
Sealed and insulated design:
robust for outdoor use.
Easy to scale up: standard 40ft format, quick to install.
Ready-to-use module -
compact data center for mining
‘out of the box’.
Six-tier racks with high density
of up to 144 devices.
Integrated ventilation - 10 industrial fans and evaporation wall.
Complete electrical wiring - from
PDU to protection, copper
busbars, input cabinet.
Network structure - pre-
installed switches, routers,
Ethernet.
Thermal insulation and sealing -
butyl, insulators, heat sealing.
Full integration of water cooling
systems.
Maximum device density per
square meter.
Minimal heat loss and high
cooling efficiency.
Support for high-performance
miners such as Antminer S19 Hydro,
S21 Hydro and similar miners.
Full Antminer compatibility - perfect integration with Bitmain hardware.
Minimal installation time - comes in high availability.
Industry safety standards - NFPA, UL, CSA certification.
High energy efficiency - especially with Hydro models (PUE up to 1.022).
Convenient logistics - standard shipping container format.
Full integration of immersion
baths.
Heat dissipation via heat
exchangers or external cooling
towers.
Reduced wear and tear on
equipment through soft cooling.
Stable operation even in
extremely hot climate.
Full Antminer compatibility -
perfect integration with
Bitmain hardware.
Minimal installation time -
comes in high availability.
Industry safety standards - NFPA,
UL, CSA certification.
Convenient logistics - standard
shipping container format.
Capacity
up to 240 units for placement
in 2U racks
Maximum power
2500 kW Maximum IT-load: 2400 kW
Cooling system
Guntner/Kelvion
Control systems
Siemens intelligent remote control
Operating temperature
-35°C ~ 50°C
Relative operating humidity
5% ~ 95% RH
Catalog
ANTSPACE HW5 210
ANTSPACE HW5 210
-
Consumption:
1.25 MW -
Operating mode:
from- 40 to +35℃ -
Size:
12192x2438x2896 mm -
For equipment:
ASIC -
Under placement:
T21 -
Capacity:
315 pcs
ANTSPACE HW5 210
-
Consumption:
1.25 MW -
Operating mode:
from- 40 to +35℃ -
Size:
12192x2438x2896 mm -
For equipment:
ASIC -
Under placement:
T21 -
Capacity:
315 pcs
Request
a consultation
Feel free to ask any questions. Our specialist will answer your questions